Process and packaging lines
We build machines for process and packaging lines.
Designing, building and shipping from Gebze to 62 countries since 1978.
- 1978
- Founded
- 62
- Export markets
- 68.000 m²
- Covered production area
- 780
- Employees
- 1.400+
- Machines per year
- %4,2
- R&D share
Product families
- Process equipmentStainless tanks, reactors, agitators and heat transfer equipment.
- Filling and cappingVolumetric and gravimetric filling lines for liquid, viscous and powder products.
- Packaging linesLabelling, cartoning, palletising and end-of-line automation.
- CIP / SIP systemsClean-in-place and sterilise-in-place units with recovery by design.
Product families
Which part of the line do we build?
Process equipment
Stainless tanks, reactors, agitators and heat transfer equipment.
DetailsFilling and capping
Volumetric and gravimetric filling lines for liquid, viscous and powder products.
DetailsPackaging lines
Labelling, cartoning, palletising and end-of-line automation.
DetailsCIP / SIP systems
Clean-in-place and sterilise-in-place units with recovery by design.
DetailsPT Series process tank
500–30,000 litre jacketed stainless process tank, CIP ready.
- Volume
- 500 – 30,000 L
- Shell material
- AISI 316L / 304
FL linear filling machine
4–12 nozzle linear filler, volumetric or gravimetric.
- Capacity
- 1,200 – 6,000 bottles/hour
- Fill volume
- 50 – 5,000 ml
CIP compact unit
Two-tank clean-in-place unit with recovery.
- Tanks
- 2 × 1,000 L
- Flow
- 10 – 30 m³/hour
Sectors
Who do we build for?
Every sector has its own rules, and the equipment is chosen to meet them.
Global network
Lines running in 62 countries
Our plants are in Türkiye; sales, service and spare parts sit on five continents.
75
Markets
11
Authorised partners
%71
Export share
Quality
A machine ships with its paperwork
Material certificates, weld records, test protocols and the manual all travel in the machine file.
- 01Incoming inspectionSheet, pipe and profile arrive with material certificates; every lot is verified by spectrometer.
- 02In-process measurementFirst-article approval on CNC, WPS/PQR tracking in welding and interim dimensional reports.
- 03Weld inspection100% visual, penetrant and radiographic testing on selected seams; records stay in the machine file.
- 04Pressure and leak testHydrostatic testing on pressure equipment, helium leak testing on hygienic lines.
- 05Factory acceptance test (FAT)The line runs on the customer's own product at our plant; capacity and accuracy are measured to protocol.
- 06Site acceptance test (SAT)After commissioning the same protocol is repeated on site, with training and the file handed over.
Certificates
- ISO 9001:2015
- ISO 14001:2015
- ISO 45001:2018
- ISO 50001:2018
- ISO 27001:2022
- CE
- ATEX
- PED
Let's build your line together
Tell us the product, the capacity and the site conditions; our engineering team will come back with a budget quote and a line layout within three working days.